Massive beams from local spruce, a consistently level floor and a carefully built wall structure: in this conversion, the basis for the further interior fit-out was created.

After dismantling the old floor, the building was open from the cellar to the ceiling of the second storey. The existing intermediate floor had been removed completely. That is where the rebuild by ROOTS Woodwork began – step by step, from the load-bearing timber structure to the cladding of walls and ceilings.

Initial situation after dismantling: the building is open across several storeys.

Local spruce carries the new floor

For the new intermediate floor, massive beams from local spruce were installed and precisely aligned to a common level. Flumroc stone wool was used between the beams. OSB boards with tongue and groove were then laid neatly on top.

Solid spruce beams, precisely aligned to a common level.

The result: a consistently level floor surface. The previous differences in height have disappeared, and the rest of the build can now continue on one uniform level.

Mineral wool between the beams and tongue-and-groove OSB boards.

Insulation in two layers

The perimeter joints were then taped and the exterior walls fitted with wind paper. A first vertical battening created space for the first insulation layer.

Breather paper and vertical battens for the further wall build-up.

This was followed by a second, horizontal battening with additional insulation. With this staggered build-up, the joints in the two insulation layers overlap. That creates insulation that is as continuous as possible.

Horizontal battens for the second insulation layer.

Careful junctions through to the finish

A vapour barrier was then fitted over the insulation and connected airtight to the floor and ceiling. These transitions in particular demand careful work: every sheet and every joint are part of the functioning overall build-up.

Vapour barrier with taped connections to floor, walls and ceiling.

A vertical battening, 30 millimetres thick, then formed the substructure for the Fermacell boards. Its spacing was matched to the board dimensions. Finally, the walls and ceilings were given their cladding in gypsum fibre boards.

Viel of dieser Arbeit verschwindet später hinter den fertigen Oberflächen. Doch genau dort entsteht die Qualität: in sauber ausgerichteten Balken, durchgehender Dämmung und präzisen Anschlüssen.

Your project

Planning a new intermediate ceiling or an interior fit-out?

We discuss with you what your building needs — from the load-bearing timber structure to careful interior finishing.