The challenge on the Meretschi-Alp started with the transport: building materials arrived by helicopter. Another transport route led through an underground tunnel around two kilometres long – with a small cart that had to be pushed by hand.
Up there was a building with history. Here, ROOTS Woodwork was able to combine the existing structure with a new timber construction and facade cladding.
First transport. Then build.
Helicopter flights and transport through the tunnel had to fit in with the construction sequence. What is needed first? What has to go? On a remote site, missing material can’t be replaced quickly.
Preparation and coordination within the team were therefore especially important. The material had to be ready up top so that the next steps could be carried out without unnecessary interruptions.
New timber meets old structure.
The natural stone plinth, the older beams and the existing shape of the building set the framework for the timber work. New elements had to be fitted precisely and the connections executed carefully.
The light timber cladding stands out from the weathered existing structure. In this way, the building’s history stays visible while the conversion gives it a new expression.
Working with the mountain weather.
Wind, rain and changing temperatures were part of the challenges on the alp. Materials and open elements had to be protected, and the work adapted to the conditions.
So beyond precise craftsmanship, it also took flexibility and good coordination. The special location had to be kept in mind at every step – from transport to assembly.